Kazatomprom made the first delivery of fuel assemblies (FAs) of the AFA 3G TM design manufactured by Ulba-FA LLP to China. The nuclear power plant accepted the FAs.

Kazatomprom completed a physical delivery of natural uranium, using the Trans-Caspian International Transport Route (TITR).

S&P Global Ratings assigned the first ESG score to Kazatomprom.

Kazatomprom was recognised the Best ESG Disclosure Leader by PriceWaterhouseCoopers.

2022
October

● Kazatomprom held its first Analyst Day since the COVID-19 pandemic began, as well as a study tour around the Company's production facilities and mines in South Kazakhstan.

● The Company announced the commencement of a project to build a sulphuric acid plant in Turkestan Region.

2022
September

● Yerzhan Mukanov was appointed as Chairman of Kazatomprom’s Management Board.

2022
July

Kazatomprom paid KZT 227.4 billion in dividends for 2021.

Kazatomprom announced the resignation of Mazhit Sharipov as Chairman of the Management Board.

2022
May

● The first delivery of natural uranium concentrates to ANU Energy OEIC Ltd. as part of the first phase of the uranium fund development.

2022
March

● Kazatomprom joined the UN Global Compact.

● The Company invested USD 24.25 million in ANU Energy OEIC Ltd, a physical uranium storage fund. This was a 32.7% share of the joint investment by ANU Energy investors.

2021
DECEMBER
  • Following an independent assessment conducted in 2021, the Company’s corporate governance rating was upgraded from BBB to A
     
  • Kazatomprom introduced a contouring tool powered by machine learning technologies at JV Khorasan-U LLP, Baiken-U LLP, and Semizbay-U LLP
     
  • December 30 – sale and purchase agreement on the sale of 40% share at Caustic JSC was concluded between the Company and United Chemical Technologies Trading House LLP, one of the majority shareholders of Caustic JSC
     
  • JV Budenovskoye LLP received an addendum to Subsoil Use Contract for commercial production at blocks 6 and 7 of the Budenovskoye field
     
  • The Company received Subsoil Use Contract for the commercial production of uranium at the Zhalpak field transferred to ME ORTALYK LLP
2021
NOVEMBER
  • November 5-10 – Company took part in China International Import Expo 2021, Shanghai, held in an online format. On the sidelines of the event, Kazatomprom signed two contracts for the supply of Kazakhstani natural uranium concentrate, one with China National Uranium Company Limited (CNUC), and one with State Nuclear Uranium Resources Development Company Limited (SNURDC)
     
  • Kazatomprom officially signed a framework agreement with Genchi Global Limited to invest in ANU Energy OEIC Ltd Physical Uranium Fund registered with Astana International Financial Centre (AIFC)
     
  • November 10 – Company held an official opening ceremony to launch Ulba FA LLP
     
  • November 19 – 100% shares at KazPV project related subsidiaries – Kazakhstan Solar Silicon LLP, Astana Solar LLP and MK Kazsilicon LLP were sold
2021
NOVEMBER
  • November 5-10 – Company took part in China International Import Expo 2021, Shanghai, held in an online format. On the sidelines of the event, Kazatomprom signed two contracts for the supply of Kazakhstani natural uranium concentrate, one with China National Uranium Company Limited (CNUC), and one with State Nuclear Uranium Resources Development Company Limited (SNURDC)
     
  • Kazatomprom officially signed a framework agreement with Genchi Global Limited to invest in ANU Energy OEIC Ltd Physical Uranium Fund registered with Astana International Financial Centre (AIFC)
     
  • November 10 – Company held an official opening ceremony to launch Ulba FA LLP
     
  • November 19 – 100% shares at KazPV project related subsidiaries – Kazakhstan Solar Silicon LLP, Astana Solar LLP and MK Kazsilicon LLP were sold
2021
OCTOBER
  • October 29 – Ulba FA LLP was recognised by CGNPC-URC as a certified supplier of fuel assemblies to Chinese nuclear power plants
2021
SEPTEMBER
  • September 23 – NAC Kazatomprom JSC became a co-founder of the Vienna Group during the 65th Annual General Conference of the International Atomic Energy Agency (IAEA)  
     
  • September 24 – Ulba FA LLP had its fuel fabrication licensed in cooperation with Framatome, receiving the AFA 3G AA Fuel Assembly Production Certificate
2021
SEPTEMBER
  • September 23 – NAC Kazatomprom JSC became a co-founder of the Vienna Group during the 65th Annual General Conference of the International Atomic Energy Agency (IAEA)  
     
  • September 24 – Ulba FA LLP had its fuel fabrication licensed in cooperation with Framatome, receiving the AFA 3G AA Fuel Assembly Production Certificate
2021
AUGUST
  • August 12 – Moody's Investors Service upgraded the Company's rating from Baa3 to Baa2, with stable outlook
2021
JULY
  • July 15-22 – Company paid KZT 150.1 billion in dividends, or KZT 578.67 per ordinary share (one GDR equals one ordinary share)
2021
May
  • Ulba FA LLP plant received the first order from CGNPC-Uranium Resources Co (CGNPC-URC) to supply fuel assemblies to Chinese nuclear power plants in 2022
2021
April
  • Company liquidated Kazatomprom-Damu LLP
     
  • April 22 – sale and purchase agreement was signed to sell 49% share of ME ORTALYK LLP to a subsidiary of China General Nuclear Power Corporation (CGNPC)
2020
December
  • The Company attracted two new US-based customers.
  • Ulba-FA LLP signed a long-term contract for the fuel assembly supply with CGN-Uranium Resources Co., Ltd.
  • Commissioning of the fuel assembly plant Ulba-FA LLP was completed.
2020
September
  • Kazatomprom held an online event, Digitalisation and People, under its Digital Transformation Programme. The event brought together representatives of Samruk-Kazyna JSC and its portfolio companies, managers and employees of the Corporate Centre, subsidiaries, and affiliates of Kazatomprom.
2020
August

The Company made the first delivery of Kazakh natural uranium to Argentina under an agreement with Dioxitek.

2020
June
  • Samruk-Kazyna JSC completed a secondary offer of additional shares and global depositary receipts (GDRs) on the London Stock Exchange and AIX. This resulted in a 25% free float percentage of the Company’s shares.
2020
May
  • Annual General Meeting of Shareholders held. The shareholders approved and the company paid dividends of KZT 99 billion based on the 2019 performance, equating to KZT 381.72 per ordinary share (one GDR equals one ordinary share).
2020
April

After the government issued a state of emergency in the Republic of Kazakhstan, striving to ensure workplace safety and preventing the spread of the coronavirus infection, NAC Kazatomprom JSC took a number of measures to protect its workers' wellbeing. The Company suspended mine preparation works and repair and renewal operations for three months to minimise the presence of employees at workplaces at any one time

2020
March

•            The Company completed a deal to sell 50% minus one share in the Uranium Enrichment Centre to its partner in this joint venture, TVEL JSC. The Group reserves one share in the Centre, which entitles the Company to access uranium enrichment services as previously agreed with TVEL. Actual cash consideration of Euro 90 million (KZT 43,858 million equivalent) was received.

2020
February
  • Continued supply of the new product, uranium hexafluoride (UF6), to Brazil-based Indústrias Nucleares do Brasil (INB).
2019
December
  • Changes announced to the Board of Directors: Board Chairman Jon Dudas agrees to join the Samruk-Kazyna Board, and hence resigns from the Board of Directors of Kazatomprom. Neil Longfellow is elected Acting Chairman of the Kazatomprom Board of Directors.
     
  • The International Atomic Energy Agency Low Enriched Uranium Bank (IAEU Fuel Bank), located at Kazatomprom’s Ulba Metallurgical Plant, receives its second and final shipment of low-enriched uranium (in the form of uranium hexafluoride (UF6)) from Kazatomprom (the first shipment was from Orano in October). This international project, which adheres to all international LEU storage safety standards, enters the operational stage.
2019
November
  • The Board of Directors approves a new Kazatomprom Digital Transformation Roadmap for 2019–2024.
2019
October
  • A Kazatomprom project to introduce an automated control system at the Corporate centre and separate subsidiaries and affiliates based on the SAP ERP intelligent platform wins the annual SAP Value Award for SAP clients in CIS.
2019
September
  • Sovereign Wealth Fund Samruk-Kazyna JSC (Samruk-Kazyna), the majority shareholder of Kazatomprom, completes a secondary public offering (SPO) of Kazatomprom’s global depositary receipts (GDRs), thereby increasing the free float of Kazatomprom shares to 18.72%.
  • Kazatomprom holds its first Capital Markets Day as a public company at the London Stock Exchange.
2019
August
  • Announcement of plans to extend the 20% production decrease (against subsoil use agreement volumes) into 2021 (previously 2018-2020).
2019
July
  • The closing ceremony of the Uvanas mine (the first uranium deposit in Kazakhstan, fully depleted using the ISR method) held at the Stepnoye-RU branch of Kazatomprom-SaUran LLP.
2019
June
  • KZT 80 billion in dividends paid to shareholders.
2019
May
  • The first post-IPO Annual General Meeting of Shareholders is held, attended by shareholders and their authorised representatives (98.70% of the total number of voting shares of the Company). The shareholders approve a final 2018 dividend of KZT 80 billion, the equivalent of KZT 308.46 per ordinary share (one GDR is equal to one ordinary share).
2019
March
  • The international edition of EMEA Finance recognises Kazatomprom’s IPO as the best privatisation transaction in its financial achievements on international capital markets award “EMEA Finance Achievement Awards 2018”. The Company’s IPO was also recognised by the international financial news platform GlobalCapital as “Transaction No. 1” and “Privatisation transaction No. 2” in Central and Eastern Europe, CIS, and Russia.
2018
December

The International Atomic Energy Agency (IAEA) selected NAC Kazatomprom JSC as one of the suppliers of low enriched uranium (LEU) for the IAEA LEU Bank. This demonstrates the high level of trust the international community holds in Kazatomprom as a reliable and recognized supplier of uranium.

2018
November

Kazatomprom launched IPOs on Astana International Stock Exchange and London Stock Exchange. The company placed 15% of its shares, worth approximately USD 451 million, on the London Stock Exchange. Following this, Kazatomprom entered a new phase of its corporate development.

Today Kazatomprom shareholders include investors from Kazakhstan as well as leading international investment funds.

2018
October

Kazatomprom is the first national company in the Republic of Kazakhstan to become an official partner of the global Vision Zero programme. The priority of the programme is to ensure the health, safety and well-being of employees. The programme was developed by the International Social Security Association (ISSA) and is aimed at preventing occupational diseases and accidents in the workplace.

2018
September

The President of the Republic of Kazakhstan, Nursultan Nazarbayev, held a meeting with the CEO of NAC Kazatomprom JSC Mr. Galymzhan Pirmatov. At the meeting, Mr. Pirmatov presented President Nazarbayev with the company’s results and its development prospects.

2018
August

The composition of the Kazatomprom Board of Directors changed to include three prominent, internationally experienced specialists in the uranium and atomic sectors as independent directors: Jon Dudas (Chair of the Board of Directors), Neil Longfellow and Russel Banham.

The Managing Director for Marketing and Sales at Kazatomprom, Dauren Alybayev became a member of the senior management of the World Nuclear Fuel Market International Association. This is the first time a representative of Kazatomprom was appointed to a senior management position at the association. This demonstrates the company’s willingness, as a leading uranium producer, to actively participate in the development of a peaceful atom.

2018
July

After the successful IPO of Yellow Cake Plc – a long-term holder of physical uranium – Kazatomprom provided the first supply of over 3,100 tons of natural uranium, which is more than 5% of the world production from primary sources (according to UxC forecast), to the company. This transaction was made subject to the terms of the long-term contract signed between the companies on May 10, 2018.

2018
July

Kazatomprom entered a new European market when it concluded a contract for natural uranium supplies with Swedish utility, Vattenfall, after being selected by the company following a tender process. Kazatomprom successfully met the arrangements of the contract.

2018
May

Kazatomprom won the international tender for the supply of natural uranium to Indústrias Nucleares do Brasil (INB). This was Kazatomprom’s first client based in Brazil, and it successfully met the terms of the arrangement.

2017
June

The International Specialized Exhibition Astana EXPO-2017 was held in the Republic of Kazakhstan. For the purpose of participation in the exhibition, the pavilion «World of Nuclear Energy» was built by the world leaders in the nuclear industry – Kazatomprom, Rosatom, Cameco and AREVA*. It clearly showed all the latest achievements of the nuclear industry, nuclear power security and environmental safety, as well as prospects for the development of the industry.

2017
April

On April 21, 2017, an Agreement was signed between NAC Kazatomprom JSC and NJSC KazNRTU named after K.I. Satpayev in Almaty that created the International Scientific and Educational Centre for Nuclear Industry. The Centre trains highly qualified specialists for the nuclear industry in Kazakhstan, while also training foreign students. The educational institution will improve training methods and technology in ways that support Kazatomprom.

2017
April

On April 10, 2017, a major agreement was signed between NAC Kazatomprom JSC and AREVA* that strengthened their long-standing cooperation in the uranium mining sector of the Republic of Kazakhstan. The official signing ceremony took place in Astana with the participation of Mr Kanat Bozumbayev, Minister of Energy of the Republic of Kazakhstan and Mr Philippe Varin, Chairman of the Board of Directors of AREVA*. This agreement benefits both Kazakhstan and France, while opening new opportunities for developing and improving their joint venture, JV KATKO LLP (AREVA* (51%) and Kazatomprom (49%)).

*Orano

2017
Март

On March 30, 2017, the Board of Directors of Kazatomprom approved the acquisition of 49% of the shares in the charter capital of JV SARECO LLP from Sumitomo Corporation.

2017
March

In March 2017, a Memorandum of Cooperation was signed between NAC Kazatomprom JSC, UMP JSC and the Akimat of the East Kazakhstan region. Under the Memorandum, KZT 3 bln was transferred to the regional budget for social and economic development of East Kazakhstan for 2017-2019.

2017
February

Kazakhstan and Mongolia intend to cooperate in nuclear field

During a meeting between representatives of Kazakhstan and Mongolia the  areas of mutual interest including geological exploration, uranium mining and processing were highlighted for cooperation.


2016
December

 

Kazatomprom has started construction of a plant to produce fuel for Chinese nuclear power plants.

Kazatomprom and Czech Uranium Industry signed a Memorandum on Cooperation in the field of nuclear energy.

2016
November

Kazatomprom and Kazakh National Technical University signed an agreement on scientific and technical cooperation in the field of fundamental and applied research in nuclear and alternative energy and personnel training.

2016
October

Kazatomprom and Rosatom signed a Memorandum of Understanding and Expanding of Strategic Cooperation in the field of NFC.

 

The trading company TH Kazakatom AG was established to strengthen Kazatomprom’s international marketing functions and attract new customers.

 

Kazatomprom started the implementation of 26 projects as part of the business Transformation program which will allow the company to obtain economic benefits worth more than 130 billion tenge by 2025.

2016
September

Kazatomprom signed an agreement with the Chinese CGNPC for the supply of Kazakh fuel pellets to Chinese nuclear power plants until 2024.

2016
July

Kazatomprom and its Chinese partners strengthen cooperation by discussing the further implementation of joint Kazakh-Chinese projects and attracting investment in the nuclear industry of the Republic of Kazakhstan.

2016
May

The Company agreed with Cameco on restructuration of LLC “JV “Inkai” and increase of the share of Kazatomprom in the Joint Venture from 40% to 60% in 2018.

During the framework of a pilot project, the Company launched the “Digital Mine” system at the mining company LLP “Kazatomprom SaUran”. Due to introduction of this system, the equipment diagnosis period was reduced from 14 to 2 days, electricity, the consumption of materials and reagents was reduced by ten percent, the time of low-productivity wells was reduced by three times

2016
April

Kazatomprom signed an agreement with ConverDyn for joint marketing efforts in the UF6 market.

2015
December

During the official visit of Prime Minister of Kazakhstan, Karim Massimov to China, Chairman of the Board of Kazatomprom Askar Zhumagaliev and the CEO of CGNPC Zhang Shanming signed an agreement of commercial terms for the development and construction of a plant for the production of fuel assemblies in Kazakhstan and joint development of uranium deposits in Kazakhstan.

At the end of the year Kazatomprom  was the winner of the “Best Product of Kazakhstan” competition in the nomination “For contribution to the development of local content”. National Atomic Company is recognized as the best customer support of domestic producers.

2015
November

Kazatomprom, “The Japan Atomic Power Company” and “Marubeni Utility Services, Ltd.” signed a tripartite Memorandum of Understanding (MoU) According to the document, the parties intend to develop cooperation in the field of nuclear energy, including consultation, exchange of experience in public relations, the organization of technical workshops and expert meetings on security issues, as well as training and development of qualification for the specialists in the nuclear industry.

2015
October

The company’s Transformation program was launched.

Kazatomprom and Centrus Energy Corporation signed a Memorandum of Understanding, which envisaged the development of a mutually beneficial relationship for the implementation of Kazakhstan's competitive supply of natural uranium to the world market.

2015
September

President of Kazakhstan, Nursultan Nazarbayev hosted, the Chairman of the Board of Kazatomprom Askar Zhumagaliyev. During the meeting, A. Zhumagaliyev reported to the President on the approval of the development strategy of the national atomic company which defined key objectives of Kazatomprom  for the next 10 years.

Askar Zhumagaliyev and the  Kazatomprom  delegation participated in the annual symposium of the World Nuclear Association (World Nuclear Association - WNA) in London.

During the symposium, head of Kazatomprom held a series of bilateral talks with foreign partners. In particular, Askar Zhumagaliyev met with President of “Cameco” Tim Gittsel, the senior executive vice-president of “AREVA” Wonsam Olivier, President of Uranium One, Vasily Konstantinov and others.

2015
August

The Chairman of the Board of Kazatomprom Askar Zhumagaliyev ", visited Vienna. During the meeting with the CEO of the International Atomic Energy Agency (IAEA) - Yukiya Amano, a wide range of matters of bilateral cooperation in the nuclear field and the peaceful use of nuclear energy were discussed. The practical matters of establishment of the Bank of low-enriched uranium IAEA in Kazakhstan were discussed.

In late August, , the Chairman of the Board of Kazatomprom Askar Zhumagaliyev  presented the Development Strategy for Year 2015-2025 to the members of the Board of Directors. The document defined the mission, vision and overall direction of the company's development in the coming years and outlined the strategic goals that would improve the efficiency of its operation and increase its value.

2015
July

During his visit to the Russian Federation, the Chairman of the Board of Kazatomprom Askar Zhumagaliyev  met with the CEO of "Rosatom"  State Corporation Sergei Kiriyenko. During the meeting a wide range of issues of bilateral cooperation in the field of nuclear energy was discussed.

2015
June

The Chairman of the Board of Kazatomprom Askar Zhumagaliyev, visited the UAE on a working visit in order to study international experience in the field of peaceful use of nuclear energy and develop mutually beneficial cooperation. Zhumagaliyev visited the construction site of the nuclear power plant "Barack" and got acquainted with all phases of nuclear power plant construction.

2015
May

Askar Zhumagaliyev was appointed as a Chairman of Kazatomprom.

Kazatomprom repaid its 5-year USD 500 million Eurobond with a coupon of 6.25% issued in May 2010.

2015
March

By the end of the first quarter, Ortalyk mined its 10,000th ton of uranium at the Central Mynkuduk deposit in the Sozak district of South Kazakhstan region. Sulfuric acid plant CKZ-U produced its first millionth ton of acid in Zhanakorgan district of the Kyzylorda region.

 

2015
February

Kazatomprom presented to the management of JSC "National Welfare Fund "Samruk-Kazyna", the design of  strategic initiatives of Kazatomprom within the framework of its Transformation Program.. The document, developed by international consultants, provides for an improvement in the efficiency of investment as well as the company’s operational activities and its productivity.

2015
Whole year

More than 23 800 tons of uranium was produced by the companies within the Kazatomprom holding, which allowed the company to maintain a leading position in the world of uranium production.

During the year Kazatomprom made agreements that are strategically important for Kazakhstan’s nuclear industry with:

  • Chinese CGNPC on commercial terms for the design and construction of a plant for production of fuel assemblies in Kazakhstan
  • French Électricité de France (EDF) for the supply of EDF 4500 tons of natural uranium concentrate from 2021 to 2025
  • Government of India for the supply of 5000 tons of Kazakh uranium to India
  • IAEA on the establishment of the Bank of low-enriched uranium in the Republic of Kazakhstan, which will be located on the territory of the Ulba Metallurgical Plant
  • Qatar Solar Energy to establish a joint venture in the field of solar energy
2014
December

Kazatomprom and the China General Nuclear Power Corporation (CGNPC) signed an agreement on expanding and deepening mutually beneficial cooperation in the field of nuclear energy.

Kazatomprom signed a Memorandum of Cooperation with the Kyzylorda Oblast for 2015-2016, under which the company undertakes obligations for social infrastructural development, improving well-being and lives of the citizens of the region.

2014
October

"Volkovgeology" received the main prize of the annual republican competition RATIONALIZER.KZfor the best system of innovation support in the enterprise. In the nomination "Best rationalization decision of the Year" the second place and a cash prize was given to innovators of tantalum production of "Ulba Metallurgical Plant".

Nurlan Kapparov, the Chairman of the Board of Kazatomprom, during a working visit to the People’s Republic of China, held talks with the heads of Kazatomprom partner companies and Chinese government officials, and discussed the development of cooperation and joint projects.

2014
September

Kazatomprom delegation took part in the 39th Annual Symposium of the World Nuclear Association (World Nuclear Association - WNA). The head of Kazatomprom Nurlan Kapparov became a participant in a panel discussion on the main threats and opportunities for the fuel cycle companies.

Kazatomprom organized the VII International Scientific and Practical Conference "Topical problems in the uranium industry", which was attended by more than 250 uranium industry specialists from the CIS including Kazakhstan, Russia, Uzbekistan and Kyrgyzstan,  as well as  France, Germany, USA , Canada, Norway, the UK, Japan and other countries.

During the 58th session of the General Conference of the International Atomic Energy Agency (IAEA), Nurlan Kapparov, the Chairman of the Board of Kazatomprom, met with the Director General of the IAEA Yukia Amano, US Secretary of Energy Ernest Moniz, head of the Rosatom State Corporation Sergey Kiriyenko, as well as with the heads of delegations of India, France and China.

2014
August

Nurlan Kapparov became the head of Kazatomprom.

The same month, a joint Kazakh-Canadian uranium mining company Inkay reached a production of 10,000 tons of uranium from the start of exploration of the deposit.

2014
June

The process of reorganization of the Mining Company was completed through its merger with Kazatomprom.

2014
April - May

Since its opening the joint Kazakh-Russian uranium mining company LLP “Betpak Dala” extracted 20,000 tons of uranium from the Akdala and Inca deposits.

2014
March

As part of  the official delegation headed by the President of the Republic of Kazakhstan Nursultan Nazarbayev, the representatives of Kazatomprom took part in the III Nuclear Security Summit.

2014
Whole year

The volume of uranium production in the Republic of Kazakhstan amounted to 22,829 thousand tons.

The National Atomic Company continued exploration work aimed at increasing the resource base of uranium on the territory of the Republic of Kazakhstan in 2014. More than 986 exploration wells totalling 452,946 linear meters were drilled during the year.

A joint Kazakh-Russian uranium mining company Betpak Dala extracted 20,000 tons of uranium from the Akdala and Inca deposits.

2013
December

MAEC-Kazatomprom launched a new distillation desalination plant for seawater desalination with the capacity of 12 000 tons per day.

2013
October

The creation of a full cycle of production of solar panels in Kazakhstan has been completed.

Kazatomprom became a shareholder of Kaustik.

2013
September

Moody's Investors Service affirmed the issuer rating of Kazatomprom at Baa3.

The joint venture OAC acquired a 25% plus 1 share in the largest Russian separation company Ural Electrochemical Plant. And in November 2013, 300 thousand SWU worth of production was sent to consumers.

2013
Whole year

Kazatomprom retained its position as the world leader in natural uranium mining, continuing to provide about 20% of the world's demand for this raw material even though the year was not the most favourable for many players in the uranium market.

Kazatomprom opened an office in the United States - the third overseas office of the company.

During the year, more than 2,300 exploratory wells were drilled.

2012
December

On December 25, LLP «Astana Solar» was launched commissioning of the plant for the production of photovoltaic modules in Astana. Production line was started by the President of the Republic of Kazakhstan Nursultan Nazarbayev. Plant LLP «Astana Solar» is the final technological link of KazPV major project, where fully integrated production line for the production of renewable energy was created in Kazakhstan.

President of the Republic of Kazakhstan Nursultan Nazarbayev presented the main awards of the best domestic enterprises of the country's industrialization. JSC "NAC" Kazatomprom " was recognized "innovation leader" for 2012.

2012
November

The opening ceremony of a new industrial complex of collective concentrates of rare earth metals (REM), built by the joint Kazakhstan-Japanese company Summit Atom Rare Earth Company (SARECO), took place in Stepnogorsk, Akmola region.

2012
October

With the help of uranium mining companies, such as "Ortalyk" and "Katko" in the Shu province of South Kazakhstan region, for the first time since the founding, there was a high-quality drinking water. It provides a supply container water treatment system, the smooth and efficient operation that provide alternative power sources - solar panels and wind stations. Since the establishment of Shu in 1962, its inhabitants had to experience problems with drinking water. The nearest borehole is 20 kilometers from the province.

On October 26,  in Astana by the initiative of the Ministry of Education and Science of the Republic of Kazakhstan,  patrons were honored in the field of education. The head of JSC "NAC" Kazatomprom" was recognized as one of the top philanthropists in the category "Investing in the Future " and was awarded a gold medal "Patron".

On October 30, The heat pump boiler in the Kirov high school of Praporschikovo village of Glubokoe district of East Kazakhstan region is started. This is the first object of education, heating of which will be carried out on the basis of heat pump units (HPU), produced in "Mashzavod" - subsidiary of JSC "UMP".

2012
July

Kazatomprom received awards again. Within the framework of the Third International Mining and Metallurgical Congress - Astana Mining & Metallurgy (AMM 2012), there was awarding of winners of the "Golden Hephaestus". "Geology of the Year" was the director of the branch of JSC "Volkovgeology" "prospecting expedition №7" - Shepelev Sergey, the discoverer of the "Inkai"deposit and the Honorary Prospector. The second prize of holding company "Kazatomprom" has brought LLP "Institute of High Technologies", which became the winner in the category - "Leader of Innovation of the Year".

on July 14, JSC "NAC" Kazatomprom "celebrated its 15th anniversary. For 15 years the company has come a long way to success. Kazatomprom not only successfully overcome all the difficulties, but also largely extent the industry's potential, turning Kazakhstan into the most powerful uranium power.

2012
June

The SKZ-U plant started production of sulfuric acid.

2012
May

Kazatomprom signed a Memorandum of Understanding on a comprehensive strategic partnership with the Japan Bank for International Cooperation (JBIC).

Kazatomprom signed a Memorandum of Intent and mutually beneficial cooperation for the development project of rare-earth metals in the Republic of Kazakhstan with Sumitomo Corp. and the Japan Oil, Gas and Metals Corporation (Japan Oil, Gas and Metals National Corporation (JOGMEC).

2012
March

JSC "Ulba Metallurgical Plant" was awarded winning the main prize of "Senim-2011" national contest. "UMP" was recognized the winner in two nominations: "The Best Company employer in the region, with more than 250 employees" and "Best HR-project".

On March 27, "Ulba Metallurgical Plant" held a public hearing, the theme of which was the construction of a new production of fuel assemblies (FA) for nuclear power plants. Representatives of the executive power, deputies of the city maslikhat, public organizations of Ust-Kamenogorsk, the activists of "Nur Otan", the employees of UFG are brought together to discuss the project. The meeting was attended by experts of the company AREVA, taking part in the project. As a result of hearings the protocol was designed, which recorded the general opinion of the participants is positive, attitude to the construction of a plant for the production of fuel assemblies on the basis of JSC "UMP". It was decided to approve the draft and send it to the environmental impact assessment in accordance with the law.

2012
February

2012 was full of significant dates in the history of the Company. LLP "Institute of High Technologies" celebrated a 10-year anniversary. Seminar "Recent scientific and technological issues of the uranium industry. Energy and resource conservation. " was timed to this event.

 
2012
2012

LLP "Taukent mining and chemical plant" - one of the largest uranium mining companies in Kazakhstan, has marked the 30 anniversary of the creation. The main activity of TMCP until 2004 was uranium mining and processing to yellowcake, wherein the content of uranium concentrates is about 30%. Uranium mining and processing added in 2014. JSC "NAC" Kazatomprom " is based on TMCP refinery, mine group allowed the company to produce export products - uranium oxide, with the content of the metal up to 87%. Today TMCP produces high quality products with the classic method of uranium extraction from sulfuric acid solutions.

2011
December

On December 10, JSC "NAC "Kazatomprom" and the Atomic Energy Commission and alternative energy sources in France (CEA) signed documents aimed at strengthening cooperation in the field of new technologies and the implementation of joint projects in the exploration and processing of rare and of rare earth metals (RM&REM) in the Republic of Kazakhstan.

Kazatomprom and German Chemieanlagenbau Chemnitz GmbH signed a memorandum, which defines the terms of cooperation on creation of joint Kazakh-German world-class innovations, breakthrough technologies and new high-tech industries in the nuclear, chemical and metallurgical sectors of industry in Kazakhstan, Germany and other countries. There are 9 specific projects, including the construction of pilot plants for the production of hydrochloric acid, sodium cyanide, chloride production and calcium hypochlorite and other chemical products.

2011
December

2011 was remarkable for Kazatomprom in implementing the social partnership program.

The results of the contest of social responsibility of business "Paryz 2011" were announced on December 9. Kazatomprom became a winner in the nomination "The Best Social Project of the Year".

LLP "Mining Company" took the first place in the category "Best Employer of the Year in the regions", according to the results of the competition "Senim-2010", which took place from November 2010 to January 2011.

JSC "Volkovgeology" became the winner in the nomination "National pride" in the National sectoral contest "Golden Hephaestus", which defines the best in mining and metallurgy.

"Ulba Metallurgical Plant" is recognized as the winner of the Republican contest of rationalization solutions "Ratsionalizator.KZ" in the nomination "The best support system innovation in the enterprise."

2011
October

The 52-th General Assembly of the International Centre for the Study of tantalum and niobium took place in Almaty with the support of Kazatomprom, which is the largest discussion forum to discuss trends in the tantalum market and niobium, the development of production technology of tantalum and niobium products, extraction of raw materials at individual deposits and security of supply.

2011
September

Kazatomprom and Japanese Toshiba Corporation established a joint venture for research and development, production and sale of rare-metal and rare-earth products and materials.

2011
June

Kazatomprom and AREVA signed an agreement on cooperation in the field of renewable and alternative energy sources.

2011
May

Kazatomprom and Kaustik have planned new projects in the chemical industry worth USD 200 million.

Astana Solar was created to implement solar battery project on the basis of the Kazakhstan silicon.

2011
Whole year

Kazatomprom and the French company AREVA signed an agreement to establish a plant to produce nuclear fuel at the Ulba Metallurgical Plant facilities in Kazakhstan.

Kazatomprom has signed several large uranium supply contracts with existing and new customers, including the French Électricité de France (EDF) and several US energy companies.

The volume of deliveries to consumers totalled 10.3 thousand tons of uranium, accounting for about 17% of the world's reactors needs.

At the end of the year, the volume of uranium production in Kazakhstan amounted to 19.4 thousand tons, an increase of almost 9% from the 2011 level.

The construction of a new sulfuric acid plant has been completed.

2010
October

Kazatomprom and AREVA signed an agreement to establish a joint venture for production of fuel assemblies.

Kazatomprom and the Commissariat of Nuclear Energy and Alternative Energy Sources of the French Republic (CEIS) signed a Memorandum to carry out joint research in the field of solar energy (photovoltaics).

2010
August

JSC "UMP" has successfully completed the certification of the production of uranium fuel pellets in the company of China Jianzhong Nuclear Fuel (CJNF), which is a part of the China National Nuclear Company (CNNC). Thus, it is launched a large project for the supply of uranium fuel pellets to China, which will be used to make fuel for nuclear power plants in China’s largest owner – Company China Guangdong Nuclear Power Corporation (CGNPC).

2010
July

The company NFI undertook certification of uranium dioxide powders, produced by Ulba Metallurgical Plant ( "UMP" JSC) for the Japanese nuclear power plants. Completion of certification will allow UMP to go to the practical implementation of the project for the supply of nuclear fuel components to the Japanese market.

 
2010
May

Kazatomprom issued its debut USD 500 million 5-year RegS / 144A Eurobond with a 6.25% coupon.

2010
March

Kazatomprom and the Japanese Sumitomo Corporation established a joint venture SARECO (Kazatomprom -51%, Sumitomo Corporation - 49%).

2010
February

In order to create a new high-tech knowledge-intensive industries for the manufacture of products of maximum degree of readiness based on rare and rare earth metals, LLP" JV "SARECO" (Kazatomprom -51%, Sumitomo Corporation - 49%) was created by JSC "NAC" Kazatomprom "and Japanese company Sumitomo Corporation in Kazakhstan in March, 2010.

JSC "NAC" Kazatomprom "and Japanese corporation Toshiba signed an agreement to establish a joint venture for research and development, production, production and sales of rare and rare-earth products and materials.

2010
Whole year

The volume of uranium production in the Republic of Kazakhstan amounted to17.8 thousand tons, almost 30% higher than the 2009 level.

2009
December

The Republic of Kazakhstan became the first country for uranium mining in the world. Annual plan is executed on December 21, 2009. Natural uranium production amounted to 13.5 thousand tons.

2009
October

AREVA and Kazatomprom signed an agreement to establish a joint fuel enterprise IFASTAR (Integrated Fuel Asia Star).

Kazatomprom, Toshiba Corp. and Sumitomo Corp. signed several documents aimed at establishing joint ventures in the field of rare and rare-earth metals and products in Kazakhstan.

2009
August

On August 31, a construction of a new sulfuric acid plant was began in Shieli district of Kyzylorda region. The project is implemented with the participation of foreign investors - Marubeni Corp., TEPCO (Japan), Uranium One (Canada).

 
2009
April

The first mine in Kazakhstan with a production capacity of 3000 tons of uranium per year was opened at the Khorasan-1 site of North Khorasan deposit.

The first mine in Kazakhstan with a production capacity of 3,000 tons of uranium per year was opened at the Khorasan-1 site of the North Khorasan field. The output is designed primarily for the needs of Japan's nuclear power industry.

A new in-situ leaching mine Irkol was opened in Shieli district of Kyzylorda region. The mine has the production capacity of 750 tons of uranium per year.

Kazatomprom and Chinese Guangdong nuclear power Corporation (CGNPC) signed a Memorandum on creating a joint venture for the construction of nuclear power plants in China.

2009
January

Kazatomprom" signed a Memorandum of Understanding with the Indian nuclear energy corporation Nuclear Power Corporation of India Limited (NPCIL).

2009
Whole year

The Republic of Kazakhstan became the world’s number one uranium producer. Uranium production totalled 13.5 thousand tons.

2008
December

A Manufactory for the production of high-capacity condenser tantalum powders was opened in the Ulba Metallurgical Plant. Design capacity - 72.9 tons of tantalum powders of different classes per year.

2008
October

Kazatomprom and the Chinese energy corporation China National Nuclear Corp (CNNC) and China Guangdong Nuclear Power Co (CGNPC) signed an agreement on a strategic partnership. 

The agreement consists of several parts:

  • Long-term supply of natural uranium for nuclear energy in China
  • Joint development of uranium deposits in Kazakhstan
  • Fuel production for Chinese nuclear power plants
  • Construction of nuclear power plants in China
2008
June

A new mine for uranium mining by in-situ leaching method was opened on the site of the Mynkuduk Deposit "Western" in southern Kazakhstan.

A new joint venture Ulba Conversion was established with the Canadian Cameco Corporation. The production capacity of the upcoming enterprise will amount to 12 thousand tons of uranium hexafluoride (UF6) per year, which corresponds to about 17% of the world's conversion capacity. The share of Kazatomprom in the new joint venture is 51%, Cameco owns 49%.

Kazatomprom signed a strategic agreement with the French company AREVA in the field of nuclear fuel cycle. The joint uranium mining enterprise Katko (Kazatomprom – 49%, AREVA - 51%), will produce 4000 tons of uranium per year in the period up to 2039, the implementation of which will be carried out by AREVA.

2008
March

Fitch Ratings has upgraded long-term rating of Kazatomprom to BBB- and short-term rating to 'F3'.

2008
January

JSC "Volkovgeology" celebrated the 60-th anniversary of the foundation, which is the oldest enterprise of the "Kazatomprom". The Company has a huge experience in the exploration and study of uranium deposits of all types, provides geological support of all activities of the National Atomic Company - from prospecting and exploration of uranium deposits to being put into commercial operation.

JSC "Volkovgeology" is directly related to the creation of the powerful mineral resources base with total uranium reserves of 1.5 million tons (19% of explored uranium reserves in the world). Company provides a permanent radio-ecological monitoring in Kazakhstan.

2007
December

The volume of uranium production in Kazakhstan of 2007 amounted to 6.6 thousand tons of uranium compared to 5.2 thousand tons of uranium in 2006, an increase compared to the previous year was 25.7%.

2007
July

Kazatomprom signed Agreements with China Guangdong nuclear power corporation (CGNPC) and the China National Atomic Corporation (CNNC) to develop relationships in the field of nuclear energy.

2007
May

Russia and Kazakhstan established the International Uranium Enrichment Centre (IUEC). The main objective is to enable non-nuclear-weapon states to obtain enriched uranium without access to critical non-proliferation technologies. The establishment of the centre was approved by IAEA experts.

Kazatomprom negotiated and signed 24 agreements on cooperation in the field of nuclear energy with leading Japanese companies operating in the field of energy, trade and finance.

2007
May

Kazatomprom signed a Memorandum of understanding with the Japanese companies The Kansai Electric Power Co., Inc., Nuclear Fuel Industries Ltd and Sumitomo Corporation for future cooperation in the nuclear fuel production for The Kansai Electric Power Co. Inc. nuclear reactors.

Toshiba has transferred 10% stake in the holding companies owning Westinghouse to Kazatomprom for USD 540 million.

Ulba metallurgical plant signed an Agreement with Ningbo Xingye Electronic Copper Strip Co., Ltd.  to establish a joint venture Yingtan Ulba Shine Metal Materials Company Limited for beryllium bronze ribbons production.

2007
May

The insurance company NEXI opened a credit line to Kazatomprom for a period of 10 years.

Kazatomprom signed an Agreement with the Guangdong nuclear power corporation (China Guangdong Nuclear Power Holding, CGNPC), on the expansion and deepening of strategic cooperation in the field of nuclear fuel manufacturing for China's nuclear power plants, as well as the supply of resource to China's developing nuclear power industry.

Kazatomprom signed a Protocol of intent to establish a conversion company in the Republic of Kazakhstan with Cameco.

2007
Whole year

The volume of uranium production in Kazakhstan totalled 6.6 thousand tons of uranium, an increase of 25.7% compared to 2006.

2006
Whole year

The sulfuric acid plant in Stepnogorsk was put into operation.

The Vostochny Mynkuduk mine with a capacity of 1000 tons has been activated. 

Katko’s in-situ leaching mine South Moinkum switched to commercial operation.

Fitch Ratings assigned Kazatomprom a long-term foreign currency Issuer rating of BB+ and a short-term foreign currency rating of B with a positive forecast.

2006
Whole year

Moody's Investors assigned Kazatomprom Issuer rating of Baa3 with stable outlook.

Commercial operations begun at the uranium mining enterprise Zarechnoye.

A comprehensive program of Russian-Kazakh cooperation in the field of nuclear energy for peaceful purposes has been developed and approved.  The uranium mining venture Akbastau, Center for Uranium Enrichment and Nuclear Power Plants have been established as part of the program.

2006
Whole year

Cooperation with Japanese companies in various areas of the nuclear fuel cycle has increased. The first delivery of uranium to the Japanese market was carried out. Kazakh-Japanese uranium mining enterprise APPAK was created.

Cooperation with Chinese companies has deepened. Several agreements on cooperation in various fields of nuclear energy have been signed.

Kazatomprom signed an agreement with Chinese partner to establish a joint venture in China to produce beryllium bronze rolled products.

Molybdenum Enrichment Plant was built on the territory of the Stepnogorsk Mining-Chemical Complex.

2005
Whole year

Kazatomprom received a USD 150 million 3-year syndicated loan from 11 European banks.

Kazatomprom received a USD 60 million 10-year loan from the Japanese Bank Mizuho.

A new concept of mine management was implemented.

The decision on the second stage of company restructuring was made.

2004
December

At the end of the year, Stepnogorsk Mining and Chemical Combine was transferred to Kazatomprom. At the time of transmission, a production at the plant was not working. A year later, SMCC production operations were stabilized. A plan was done for the production of oxide concentrate from its own raw materials. 503 tons of uranium were produced.

2004
September

Kazatomprom announced a new large-scale program - "15 thousand tons of uranium by 2010", in London, at the symposium of the World Nuclear Association.

 
2004
Whole year

Stepnogorsk mining and chemical plant was transferred to Kazatomprom.

Katko uranium mine at the southern Moinkum site was launched.

Refinery with uranium extraction technology of direct commodity desorbate was launched at Taukent mining and chemical company.

2004
Whole year

Company’s first stage of restructuring was completed. Uranium mining functions were transferred to the newly formed enterprise Mining Company.

A subsidiary Ulba-China was created for the sales of beryllium in the free economic zone of China.

Kazatomprom announced a new large-scale program - "15 thousand tons of uranium by 2010" at the symposium of the World Nuclear Association in London.

2003
Whole year

The U-shaped sorption-desorption circuit was implemented for the first time in the Akdala mine.

A long-term contract with China for the supply of natural uranium was signed.

Kazatomprom became the world’s second biggest producer of beryllium products accounting for 29% of the total production and fourth in the tantalum industry.

The government of the Republic of Kazakhstan assigns the rescue of Mangystau nuclear power plant to Kazatomprom.

2002
Whole year

A cellular scheme autopsy of ore deposits was implemented for the first time with a complete automation of the entire production process.

Kazatomprom enters Korean uranium market for the first time.

2001
March

JSC "NAC "Kazatomprom" declared the impending shortage of natural uranium at World Nuclear Fuel Market Conference in Toronto, based on their own forecasting. The increase of production was began in Kazakhstan, despite the fact that the lowest price on the uranium market was registered in March, 2001.

2001
Whole year

Kazatomprom increases uranium production despite low uranium prices.

First output by ISR method at new Mines of South Moinkum and Akdala.

Kazatomprom enters Chinese uranium market for the first.

2000
December

At the end of year, for the first time, the net profit has been received since the creation of Kazatomprom. The company started to invest significant investments in renovation and expansion of production facilities. Salaries of employees of the Company were increased by 25%. Increase in payments to the budget and extra-budgetary funds was 60%.

2000
August

With the help of developed technologies, beryllium production was completely refocused on the issue of peaceful products, the technology for producing a copper-beryllium alloys by carbothermic method was mastered. A long-term contract with the American company "Brush Wellman" was signed.

2000
May

The company has managed to overcome the 20-year lag in technology and to launch a tantalum production with the help of scientific breakthrough of Kazatomprom specialists in 1999-2000. The production restructuring program was developed with a focus on production of modern high-capacity tantalum capacitor powders and niobium products.

2000
February

By 2000, the company has achieved a complete removal of restrictions on the sale of Kazakh uranium to the US and European markets. The result is that the geography of natural uranium export has been extended.

Kazatomprom came out on the 6th place in the world by the production of natural uranium, compared with 13th place in 1997.

2000
Whole year

Kazatomprom generates the first net profit since its establishment.

The restrictions on sale of Kazakh uranium to the USA and European markets have been lifted.

Kazatomprom became the world’s sixth biggest producer of natural uranium.

The Ulba Metallurgical Plant developed and implemented technology for the production of uranium-erbium and uranium-gadolinium fuel pellets.

2000
Whole year

The UMP became an official certified supplier of uranium dioxide powders of ceramic grade for General Electric.

Beryllium production was completely reoriented to the production of peaceful products. The production of copper-beryllium ligatures by carbothermic method technology was assimilated.

Long-term contracts were signed with the American company Brush Wellman.

1999
Whole year

The company managed to overcome the 20-year lag in technology to launch a tantalum production with the help of scientific breakthrough by Kazatomprom specialists.

The production restructuring program was developed with a focus on production of modern high-capacity tantalum capacitor powders and niobium products.

1997
1997-1998

THE CREATION OF KAZATOMPROM